Quotation for Setting Up Quartz Ball Mill in Masbate
This quotation is for the establishment of a quartz ball mill in Masbate, Philippines. The mill will be used to grind quartz ore into a fine powder for use in various applications, such as the production of optical components, semiconductors, and ceramics.

Equipment
The following equipment will be required for the installation of the quartz ball mill:
- A ball mill
- A motor
- A gearbox
- A drive shaft
- A feed hopper
- A discharge chute
- A dust collector
Ball Mill
The ball mill will be a standard type with a capacity of 100 tons per day. The mill will be made of steel and will be lined with wear-resistant material. The ball mill will be equipped with a motor that can provide a torque of 1,000 horsepower.
Motor
The motor will be a three-phase induction motor with a voltage of 480 volts and a frequency of 60 hertz. The motor will be mounted on a concrete foundation.
Gearbox
The gearbox will be a reduction gearbox with a ratio of 10:1. The gearbox will be mounted on the motor.
Drive Shaft
The drive shaft will be made of steel and will be 10 meters long. The drive shaft will be connected to the gearbox and the ball mill.
Feed Hopper
The feed hopper will be made of steel and will have a capacity of 10 tons. The feed hopper will be mounted on the ball mill.
Discharge Chute
The discharge chute will be made of steel and will have a length of 10 meters. The discharge chute will be connected to the ball mill.
Dust Collector
The dust collector will be a baghouse dust collector with a capacity of 100 cubic meters per minute. The dust collector will be mounted on the discharge chute.
Installation
The installation of the quartz ball mill will be carried out by a team of experienced engineers. The installation will include the following steps:
- The foundation for the ball mill will be excavated.
- The ball mill will be placed on the foundation.
- The motor, gearbox, drive shaft, feed hopper, discharge chute, and dust collector will be installed.
- The ball mill will be tested to ensure that it is operating properly.
Cost
The total cost of the installation is estimated to be $1 million. The cost includes the cost of the equipment, the cost of installation, and the cost of testing.
Delivery
The equipment will be delivered to Masbate within 60 days of receipt of the order. The installation will be completed within 90 days of delivery of the equipment.